db57d230

15:23. Heater block

1 – heater radiator cover;
2 – heater radiator;
3 – air mixing gate;
4 – clip;
5 – heater case;
6 – laying;
7 – gate of management;
8 – heater case.

Removal

PERFORMANCE ORDER
1. Disconnect a wire from the negative plug of the rechargeable battery.
2. Merge cooling liquid.
3. Disconnect hoses of giving and return of cooling liquid from a heater radiator.
4. Discharge the air conditioning system.
5. Disconnect the soaking-up tube and a tube for liquid coolant from the evaporator.
6. Remove a steering wheel and the multipurpose switch.
7. Remove the forward and back console.
8. Remove the lower decorative panel on the left side of the dashboard.
9. Remove the panel of the control unit of heating and ventilation.
10. Remove the control unit of heating and ventilation.
11. Remove a ware box.
12. Turn out 4 bolts and remove a safety cushion of the forward passenger.
13. Disconnect a cable from the block of heating and I will corrode from the thermostatic switch on the evaporator block.
14. Remove the dashboard.
15. Turn out nuts of fastening of the evaporator.
16. Remove the evaporator block.
17. Turn out nuts of fastening of a cross-piece and remove it.
18. Turn out 3 bolts of fastening of a heater.
19. Remove the heater block.

Installation

PERFORMANCE ORDER
1. Installation is carried out to the sequences, the return to removal.
2. After installation of the block of a heater check smoothness of movement and operation of gates.